麻豆xfplay国产在线观看_亚洲AⅤ日韩久久久xyz_女生阴道被男生插在线观看_欧美精品一区二区三区在线视频_欲色a∨人人爽网站hd播放器_最新国产在线观看福利_100款不良网站进入窗口软件_农村乱淫视频免费_亚洲永久免费播放片app一_一级特大a黄片播放视频

你現(xiàn)在的位置:首頁>企業(yè)動(dòng)態(tài)

濟(jì)南雙組份打膠機(jī)介紹安裝的順序是怎樣的?

瀏覽:0
1、雙組份打膠機(jī)設(shè)備應(yīng)安裝在干燥、無粉塵、無腐蝕性氣體的壞境中(該要求與其他設(shè)備一致,當(dāng)然如果條件達(dá)不到少爭(zhēng)取無腐蝕性氣體,畢竟設(shè)備中有電線以及管路這些配件抗腐蝕性不高)。
1. The equipment of two-component gluing machine should be installed in a dry, dust-free and non corrosive environment (the requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for non corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室內(nèi)溫度更好控制在10~40度的室內(nèi)堅(jiān)硬地面上,地面應(yīng)水平度要好。(小編這里說的地面水平度要好不一定要非常的平整才行,我們的設(shè)備在設(shè)計(jì)之初已經(jīng)考慮到了地面復(fù)雜性的因素所以對(duì)地面平整度是有相當(dāng)大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be controlled on the indoor hard ground of 10-40 degrees, and the ground should be level. (Xiaobian here says that the level of the ground must be very flat. At the beginning of the design, our equipment has considered the factors of the complexity of the ground, so it has a great tolerance to the level of the ground. As long as the range is not raised, it can work normally.)
3、雙組份打膠機(jī)安裝之前,應(yīng)先檢查是否有因運(yùn)輸、搬動(dòng)造成的變形、損壞和緊固件松動(dòng)情況,之前就曾經(jīng)有客戶在移動(dòng)打膠機(jī)的過程中把設(shè)備的智能控制系統(tǒng)的一個(gè)零部件碰掉了而導(dǎo)致設(shè)備無法正常運(yùn)行,我們的工作人員到現(xiàn)場(chǎng)后才排查出的原因。
3. Before the installation of the two-component dispenser, we should first check whether there is deformation, damage and fastener loosening caused by transportation and moving. Before that, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the dispenser, which led to the normal operation of the equipment. Our staff found out the cause after arriving at the site.
4、我們可以根據(jù)地面平整度的實(shí)際情況來通過調(diào)整設(shè)備的可升降地腳螺栓來調(diào)整設(shè)備的水平度直到設(shè)備水平而穩(wěn)固。然后按圖接線并可靠接地,把氣源接入機(jī)器所配帶的氣源接口,確保無漏氣現(xiàn)象。
4. First of all, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is level and stable. Then according to the diagram wiring and reliable grounding, connect the air source to the air source interface of the machine to ensure no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the designated position, 46 ? hydraulic oil (about 50 liters).
6、接通電源并打開查看設(shè)備是否能夠正常運(yùn)行。
6. Turn on the power and turn it on to see if the device is working properly.

上一篇:雙組份打膠機(jī)是否可以打三層中空玻璃!
下一篇:打膠機(jī)的調(diào)試工作應(yīng)該怎么做?

  • 微信