麻豆xfplay国产在线观看_亚洲AⅤ日韩久久久xyz_女生阴道被男生插在线观看_欧美精品一区二区三区在线视频_欲色a∨人人爽网站hd播放器_最新国产在线观看福利_100款不良网站进入窗口软件_农村乱淫视频免费_亚洲永久免费播放片app一_一级特大a黄片播放视频

你現(xiàn)在的位置:首頁(yè)>企業(yè)動(dòng)態(tài)

雙組份打膠機(jī)怎么更換打膠機(jī)通?

瀏覽:0
怎樣更換雙組份打膠機(jī)桶?
How to replace the two-component glue applicator barrel?
雙組份打膠機(jī),顧名思義就是用來(lái)輸送或抽送膠的流體設(shè)備。該雙組份打膠機(jī)設(shè)備主要用來(lái)輸送高粘度的流體介質(zhì)。今天就讓我們一起來(lái)看一下雙組份打膠機(jī)桶更換的幾個(gè)步驟吧
Two component gluing machine, as its name suggests, is a fluid equipment used to transport or pump glue. The two-component gluer equipment is mainly used to transport high viscosity fluid media. Today, let's take a look at the steps to replace the barrel of the two-component gluer
將空氣泵的進(jìn)氣壓力關(guān)閉
Turn off the intake pressure of the air pump
打開(kāi)排膠閥排膠以釋放內(nèi)部系統(tǒng)的壓力
Open the glue discharge valve to discharge the glue to release the pressure of the internal system
將壓盤(pán)吹氣管閥門(mén)打開(kāi)
Open the pressure plate blowpipe valve
把升降控制閥撥到“UP”的位置
Turn the lifting control valve to the "up" position
壓盤(pán)會(huì)從膠桶中提升,并終脫離膠桶合適更換膠桶的位置
The pressure plate will be lifted from the rubber barrel and finally separated from the rubber barrel to a suitable position for replacing the rubber barrel
從設(shè)備框架上移除空膠桶
Remove the empty rubber bucket from the equipment frame
關(guān)閉壓盤(pán)吹氣管閥門(mén)
Close the pressure plate blowpipe valve
清理壓盤(pán)兩個(gè)密封圈,使之表面干凈
Clean the two sealing rings of the pressure plate to make their surfaces clean
仔細(xì)檢查新膠桶是否有凹痕或別的損傷。不要用受損的膠桶,這樣會(huì)損壞壓盤(pán)
Carefully check the new rubber barrel for dents or other damage. Do not use a damaged rubber bucket, which will damage the pressure plate
把新膠桶放在設(shè)備基座中間位置上,位于壓盤(pán)的下方
Place the new rubber bucket in the middle of the equipment base and under the pressure plate
壓盤(pán)密封圈上涂潤(rùn)滑脂(諾信
Apply grease on the sealing ring of the pressure plate (Nordson)
拆下排氣及出膠口檔桿
Remove the exhaust and rubber outlet stop rod
把升降控制閥撥到“Down”的位置,慢慢把壓盤(pán)移入打開(kāi)的膠桶中。要停止壓盤(pán)移動(dòng),可把升降控制閥撥到中間“Neutral”的位置
Turn the lifting control valve to the "down" position and slowly move the pressure plate into the open rubber barrel. To stop the movement of the pressure plate, turn the lifting control valve to the middle "neutral" position
壓盤(pán)繼續(xù)下壓,當(dāng)排氣及出膠口處有一股穩(wěn)定的膠流出時(shí),把排氣及出膠口檔桿裝回壓盤(pán)并在接頭上旋緊
Continue to press down the pressure plate. When there is a stable flow of rubber at the exhaust and rubber outlet, install the baffle rod at the exhaust and rubber outlet back to the pressure plate and tighten it on the joint
換桶步驟完成,打開(kāi)空氣泵進(jìn)氣開(kāi)關(guān),正常工作
After the barrel changing step is completed, turn on the air inlet switch of the air pump and work normally
本文的精彩內(nèi)容由雙組份打膠機(jī)知識(shí)提供,本網(wǎng)站還有很多的精彩內(nèi)容,更多的內(nèi)容您可以點(diǎn)擊進(jìn)入:http://dejiansw.cn我們有專門(mén)的客服為您解答問(wèn)題
The wonderful contents of this article are provided by the knowledge of two-component gluing machine. There are many wonderful contents on this website. You can click to enter more contents: http://dejiansw.cn We have special customer service to answer your questions

上一篇:雙組份打膠機(jī)的注意事項(xiàng)
下一篇:雙組份打膠機(jī)打膠不滿是什么原因?qū)е碌模?/a>

  • 微信