雙組份打膠機(jī)換桶的操作細(xì)節(jié)
使用過雙組份打膠機(jī)的朋友都知道,雙組份打膠機(jī)的膠是密封存放在膠桶中的,膠用完了需要更換新的桶裝膠才能繼續(xù)使用。今天
濟(jì)南雙組份打膠機(jī)廠家給大家講解下更換膠桶的操作。
As all friends who have used the two-component sealant dispenser know, the sealant of the two-component sealant dispenser is sealed and stored in a plastic barrel. When the sealant is used up, you need to replace it with a new barrel of sealant before continuing to use it. Today, the manufacturer of the two-component sealant dispenser in Jinan explained the operation of replacing the glue bucket.
當(dāng)膠桶中的膠水用完時(shí),設(shè)備的三色指示燈會(huì)亮紅燈且報(bào)警(膠水檢測(cè)報(bào)警),此時(shí)應(yīng)該更換膠桶。具體步驟如下:
When the glue in the glue bucket is used up, the three color indicator light of the equipment will be red and give an alarm (glue detection alarm). At this time, the glue bucket should be replaced. The specific steps are as follows:
1、先在觸摸屏上點(diǎn)擊“膠泵停止”,及時(shí)關(guān)掉齒輪泵;
1. First click "glue pump stop" on the touch screen to turn off the gear pump in time;
2、關(guān)閉排氣閥,按住觸摸屏上的“上升”按鈕2秒,讓壓盤下邊粘的PUR熱熔膠及時(shí)脫落,不于在上升過程中從排氣閥溢出流在壓盤上面;
2. Close the exhaust valve, press and hold the "Up" button on the touch screen for 2 seconds, so that the PUR hot melt adhesive stuck under the pressure plate can fall off in time, so as not to overflow from the exhaust valve and flow onto the pressure plate during the rising process;
3、打開排氣閥,繼續(xù)按“上升”按鈕,此時(shí)PUR熱熔膠機(jī)的加熱壓盤會(huì)緩緩上升,待一個(gè)密封圈脫離膠桶口后松開“上升”按鈕,利用慣性讓壓盤慢慢脫桶,脫桶后可輕按“上升”按鈕將壓盤上升到上極限位置;
3. Open the exhaust valve and continue to press the "Up" button. At this time, the heating pressure plate of PUR hot-melt adhesive machine will rise slowly. After a sealing ring is separated from the opening of the glue bucket, release the "Up" button. Use inertia to let the pressure plate slowly release the bucket. After the bucket is removed, gently press the "Up" button to raise the pressure plate to the upper limit position;
4、將密封圈上的殘膠清理下,置換新的膠桶。
4. Clean the residual rubber on the sealing ring and replace it with a new rubber bucket.
當(dāng)膠桶內(nèi)的膠用完時(shí),應(yīng)立即關(guān)閉A、B開關(guān),停止打膠。打開A(或B)膠泵充氣開關(guān),選擇A(或B)膠泵提升機(jī)構(gòu)為上升位置,點(diǎn)動(dòng)旋鈕使壓盤慢慢提起,此時(shí)應(yīng)注意:膠桶盡量不要離開底盤,直壓盤完全脫離膠桶時(shí)關(guān)閉A(或B)膠泵的充氣開關(guān)。
When the glue in the glue bucket is used up, immediately turn off switches A and B to stop the glue application. Turn on the inflation switch of A (or B) rubber pump, select the lifting mechanism of A (or B) rubber pump as the rising position, and jog the knob to lift the pressure plate slowly. At this time, it should be noted that the rubber barrel should not leave the chassis as far as possible until the pressure plate is completely separated from the rubber barrel, and turn off the inflation switch of A (or B) rubber pump.
具體操作:將B泵關(guān)閉,打開B膠回流開關(guān)然后打開膠槍,膠條為白色即可。
Specific operation: Turn off pump B, turn on the return switch of glue B, and then turn on the glue gun until the glue strip is white.
以上就是雙組份打膠機(jī)換桶的操作細(xì)節(jié),您對(duì)此有什么需求可以隨時(shí)來我們網(wǎng)站
http://dejiansw.cn進(jìn)行咨詢了解,有關(guān)人員將竭誠為您服務(wù)!
The above is the operation details of changing barrels of two-component sealant dispenser. If you have any needs, you can come to our website at any time http://dejiansw.cn The relevant personnel will serve you wholeheartedly after consulting!
上一篇:雙組份打膠機(jī)機(jī)頭不在原位怎么調(diào)?
下一篇:打膠機(jī)設(shè)備平常使用中要進(jìn)行定期檢查